Company News

On 17th August 2023, in order to better meet the requirements of product quality and production capacity, our company put on a new geomembrane production equipment, which is now formally put into production.
2023/10/17 16:18
400g high strength polypropylene fabric has been shipped out.Since June, in order to meet the international market demand, our factory has entered into a concentrated delivery period of geotechnical materials.More than 100 tonnes of geotextile and 200 tonnes of geomembrane were successfully
2023/10/17 16:18
In order to meet the demand of customers, our factory speeds up the production and loads the trucks in the morning and evening to ensure that the geomaterials are delivered on time. The geogrid and geotextile have been packed and ready to be shipped to Qingdao port.
2023/10/17 16:17
Recently, our shipments have reached a new peak. This is thanks to the continuous power of infrastructure construction, as well as the technical progress and capacity enhancement of the geomaterial industry. As an important part of infrastructure construction, geomaterials are widely used in
2023/10/17 16:17